Euphoric look into the future

Due to the constant development and innovations of Langzauner, it was necessary to build a new assembly hall. This should be higher than the existing halls. As a result, even larger presses and production lines than before can be manufactured on the company premises according to individual customer requirements.

In April 2018, the new hall – equipped with user-friendly welding booths, an advanced extraction system and a modern high-bay warehouse – was put into operation.
The hall impresses with its intelligent use of space, which means perfect production conditions and therefore exceeds all expectations.